- Home
- Situations
- How long does a website take?
When will your website be live?A date that’s written into the quote.
A landing page is online in seven days, a website – from a business site to a shop – in two to eight weeks in total. We fix the go-live date in writing.
No obligation · 15 minutes · reply usually within 24 hours
The situation
You have a date in mind: an opening, a trade fair, a campaign or the launch of a new offer. And you’ve heard of projects that ran months over schedule.
Typical sign: agencies say “a few weeks”, but nobody explains what actually drives the timeline – or who has to deliver what, and when, for the date to hold.
Our solution
The fixed quote sets out scope, stages and a firm go-live date. The timeline depends less on the design work than on two things on your side: how ready the content is and how quickly decisions are made. So we clarify both in the intro call and build them into the stages.
Two revision rounds per phase keep the plan stable, because drafts are shown early. If it has to be very fast, we start with a landing page or your most-visited page on the final technical base and expand from there.
Web design Berlin in detailProcess & details
Six steps, two revision rounds per phase, one date:
- 01Analysis & advice
- 02Concept & structure
- 03UI design
- 04Development
- 05Testing & launch
- 06Support & growth
Tell us your target date and where your content stands. For relaunches: a refresh takes days to two weeks, a redesign three to six weeks, even a large relaunch two to eight weeks in total – and we try not to put go-live on a Friday.
Tell us your date on WhatsAppCompanies working with KULIMO
Our clients, on the map
Every pin is a partnership. Hover the globe to see who we work with, and where.
4 clients worldwide
-
Adltortechnik
Waiblingen, Germany
ADL Tortechnik is a specialist company based in Waiblingen (Stuttgart region), focused on the planning, sale, installation and maintenance of modern door, gate and loading-bay technology.
Visit site -
Das Catering
Germany
Das Catering (Das Catering Berlin) is the full-service catering arm of the Berlin restaurant concept Die Stulle. Based at the same address in Berlin-Charlottenburg, the team caters private celebrations, brand events and corporate functions in Berlin and Brandenburg.
Visit site
- Fixed quote before the project starts
- 2 revision rounds per phase
- Core Web Vitals as acceptance criterion
- WCAG 2.1 AA & GDPR
- Hosting with German partners
- Website and logins belong to you
- Owner-led studio in Berlin
This is what you get.
Every line is on our service page – nothing we don’t deliver.
- 01
Landing page
Online in seven days – with tracking and a form.
- 02
Business website
Two to eight weeks, with clearly defined milestones and regular check-ins.
- 03
Corporate website & shop
Also two to eight weeks in total – the scope decides where in that range your project lands.
- 04
Relaunch
Refresh days to two weeks, redesign three to six weeks, large relaunch two to eight weeks.
- 05
Web app
Simple web apps four to eight weeks; the first productive stage of a custom web app six to twelve weeks.
Four steps to the finish.
From the first call to the handover.
- 01
Intro call
15 minutes, free. Target date, scope and the state of your content.
- 02
Fixed quote
Scope, stages and go-live date in writing.
- 03
Concept, design, code
Sitemap, wireframes, Figma design, development – two revision rounds per phase.
- 04
Go-live & fine-tuning
Testing, launch on the agreed date, four weeks of fine-tuning, review after three months.
Frequently asked questions
How long does it take to get a website built?
A landing page takes seven days, a website – business site, corporate site or shop – two to eight weeks in total. We fix the go-live date in the fixed quote.
What delays a website project most often?
Rarely the design – usually missing content and slow decisions. That’s why we check the state of your copy and photos in the intro call and plan your approvals as fixed stages.
How long until a website shows up on Google?
It’s online on the go-live date. On Google, first improvements typically show after four to eight weeks; lasting top rankings usually take three to six months.
Can it be done faster?
Yes: a landing page is online in seven days. For a larger scope we start with your most-visited page on the final technical base and expand from there.
How long does a website relaunch take?
A refresh takes days to two weeks, a redesign three to six weeks, a large relaunch two to eight weeks in total.
Tell us your date.
15 minutes, free, no obligation. Afterwards you know whether your date is realistic and what needs to be ready by when.
Mon–Fri 9am–6pm · info@kulimo.com · Contact form